THE CHALLENGE
A technically workable process with unnecessary complexity
A Tier-1 aerospace manufacturer used 13 individual fixtures to produce a thin-walled aerospace casing.
The process worked, but it created high tooling cost, multiple re-clamping operations, longer manufacturing time, more handling risk on fragile geometry, and limited flexibility if the design changed.
High tooling cost across 13 fixtures
Multiple re-clamping operations
Longer manufacturing time
High tooling cost across 13 fixtures
Limited flexibility if the design changed

THE RESULT
A simpler production architecture with measurable gains
Tooling investment
£62,000 ➔ £52,500
15.3% reductiom
Manufacturing time
330min ➔ 265min
19.7% reductiom
Parts count
13 fixtures ➔ 7 fixtures
46% reduction in parts count
WHAT THIS DEMONSTRATES
What this demonstrates
The value was not in redesigning everything from scratch. It came from stepping back, challenging the current approach, and identifying where cost and complexity could be removed with losing the intended outcome.